1, 2 — bolts 3, 4 — listeners 125 — the air transfer pump
EXECUTION ORDER
1. Accept the filter for purification of air. 2. Accept a generator incentive belt. 3. Exclude the plug of the line of the pump. 4. Prevent bolts (1) and (2). 5. Accept the pump (125).
Device
The device will be as it should be, made down removals.