Mercedes S-Class W-140

In 1991-1999 editions

Repair and enterprise of the car



Mercedes S-Class
+ Mercedes Benz cars of the class S (W-140)
+ operation manual
+ Routine maintenance
+ motor
+ cooling systems, heating
+ systems of power supply and edition
+ electric equipment of the motor
+ Gear shifting boxes
- awtomatitscheckaja transmission
   Specifications
   Search of defects - the general information
   - Automatic transmission 722.5
      Removal, check of a state and device of the reformer of Drehens (hydro-transformer)
      Removal and device of the centrifugal regulator
      Removal and device of the touch switch of blocking of a starter (solution of start)
      Vacuum knot - a device detail
      Removal, service and the device of the repeated pump (AT to No. 3652931)
      Removal and device of a forward cover of the repeated pump
      Removal and device of the LB3 piston
      Removal and device of a back cover of transmission
      Discussion and installation of installation of AT valves
      Discussion and installation of transmission
      The device and check of freedom of action in Mehrscheibenbremse B3
      Measurement of freedom of action in B1 brake
      Connection of the raising transfer
      Removal, the device and check of components of a brake of BS of the raising transfer and the KS connection
      Discussion and installation of mufty of the free movement
      Discussion and installation of planetary mechanisms
      Discussion and installation of the K1 connection
      K2 connection
      Gear shifting Selektors lever
   + Automatic transmission 722.6
+ connection
+ brake system
+ Aufhängung and management
+ body
+ electric onboard equipment



Discussion and installation of installation of AT valves

Discussion

Design of installation of AT valves

1 — the gear shifting gate
7 — the K1 block gate
9 — Perepusknoj the gate without opening (white color)
13 — Jasytschkowyj the coming-back gate when opening
14 — spheres
14a — pressure gate
24 — the Coming-back gate of the repeated pump
33a — the screen of the gate of switching B2
35 — a feather

46 — the gate of management of pressure
54 — Perepusknoj the gate
81 — the filter
86 — LB3 drain gate
87 — Drosselnyj the K2 gate
A — a body of gates
A1 — the gear shifting gate
B — a muffler body


Removal of a body of the muffler () with mezhdudisky

4 — междудиск
A — a body of gates
B — a muffler body


Design of installation of AT valves

1 — the gear shifting gate
3 — the piston of the operating gate 2-3
4 — the operating gate 2-3
5 — the regulating prispossabliwajemosti gate of the reformer of Drehens
7 — the K1 block gate
10 — the gate of switching B1
11 — the piston of the operating gate 3-4
12 — the operating gate 3-4
16 — the regulating gate of the main pressure
17 — the gate of management 1-2
18 — the plug of the operating gate 1-2
19 — the piston of the operating gate 1-2
26 — the regulating gate of working pressure

27 — a stopper
32 — the regulating pressure gate at full opening of drosselnoj saslonki
33 — the gate of switching B2
35 — a finger of switching of pressure of Schmierens
38 — the regulating W1 gate
39 — the piston of the regulating gate 81
40 — the gate of application of the reducing transfer (blow of down)
41 — the gate of switching of the regulator of pressure
44 — pressure regulator vacuum gate
45 — the regulating pressure regulator gate
46 — the piston of regulating pressure regulator gate


Design of installation of AT valves

25 — Redukzionnyj the gate
47 — the regulating switching pressure gate
48 — the K1 muffler
49 — the K2 muffler
50 — the regulating K1 muffler gate
51 — the regulating K2 muffler gate
52 — the B1 muffler
53 — the Reception muffler
55 — the DV2 block gate
56 — the switching gate at a motor brake

57 — the regulating W1 gate
58 — the regulating gate of the reception muffler
59 — the gate of switching K2
60 — the protective W2 gate
61 — the switching brake block gate
62 — the RV1 block gate
63 — the muffler of the reducing transfer (blow of down)
64 — the gate of regulation of pressure Schmierens
85 — the gate of restriction of pressure


 EXECUTION ORDER

1. Prevent bolts.
2. Accept gates (13), (24), (86) and the screen (33a).
3. Strengthen a body of gates (A) and a body of the muffler () together and turn them.
4. Carefully raise a muffler body () with mezhdudisky.
5. Be lowered at all 19 spheres (14).
6. Accept gates which switch filtering and fingers.
7. Prevent a side cover from a body of gates.
8. Regulate pressure at full opening of drosselnoj saslonki.

Installation

Installation will be as it should be, carried out down discussions. Tighten bolts of strengthening (shooter) in such a way that both parts of a body could not change the place relatively each other.