Mercedes S-Class + Mercedes Benz cars of the class S (W-140) + operation manual + Routine maintenance - Motor Check of compression in the motor cylinder Check of the motor by means of vacuum meter Serpantinnogo belt of an incentive of auxiliary devices + 6-cylinder petrol engines (M104.944 and M104.990/994) + 8-cylinder petrol engines (M119.970/981 and M119.971/981) + 12-cylinder petrol engines (M120.980/982) - 6-cylinder diesel engines (OM603.971) The filter for purification of air - a device detail Compensation of a belt of an incentive of the generator Removal and natjaschitelja device of a belt of an incentive of the generator Final collector - a device detail GRM incentive chain cover Wave of curves Removal and device of the head of the block of cylinders Verification of the control provision of a wave of curves Compensation of a chain of an incentive of GRM GRM incentive - the general information, service of components Natjaschitel of a chain of an incentive of GRM - a device detail Removal and device of pistons Check of a state and compensation of poles of an instinct Measurement of diameters of cylinders Removal and device of covers of cylinders Check of a condition of a bent shaft Removal and device of the starlet of a bent shaft Removal and device of a peel kartera of the motor The touch switch of level of oil - a device detail Compensation of a chain of an incentive of the fat pump Removal and device of the fat pump Removal and device of a body of the fat filter + 6-cylinder diesel engines (OM606.961) + cooling systems, heating + systems of power supply and edition + electric equipment of the motor + gear shifting boxes + Awtomatitscheckaja transmission + connection + brake system + Aufhängung and management + body + electric onboard equipment
|
Removal and device of the head of the block of cylinders
Removal Preparation for removal of the head of the block of cylinders
|
|
1 — an access pipe 3, 7 — Decorative panels 4 — sewer 4a — a final collector 5, 62 — carriers 6 — the listener of rezirkuljazii of the working gases 8 — the access pipeline
|
9 — the line of a candle nakaliwa nija 10 — the filter for purification of air 11 — the listener of an admission of air 12 — the filter for fuel 13 — the rezirkuljazii gate of the working gases 93 — Kurbelstutzen 120 — the battery 155 — a basic rack X26/2 — line plugs |
|
|
|
1. Accept a wave of curves. 2. Be lowered by inschektory. 3. Accept a generator incentive belt. 4. Exclude the negative line of the battery (120). 5. Exclude a pipe of an admission of air (11) and a cover of the filter for purification of air (10) together with the filtering element. 6. Accept decorative panels (3) and (7). 7. Exclude a pipe of access (1) from a turbocompressor. 8. Prevent a basic rack (155) coming-back listeners. 9. Prevent aggravating masloprowod from the block of cylinders. 10. Accept the filter for fuel (12). 11. Prevent the carrier (62) judging pipes of the list of level of oil. 12. Accept the listener (6) between the rezirkuljazii gate of the working gases and the pipeline of access or to the listener of transfer of compressed air. 13. Exclude the rezirkuljazii gate of the working gases (13). 14. Prevent sewer (4) from a final collector. 15. Prevent lines (9) from nakaliwanija candles. 16. Exclude the plug (ò26/2). 17. Accept the pipeline of access (8). |
|
Details of the device of the head of the block of cylinders (it is the cylinder 6 really)
|
|
|
15 — the Sliding lever 16, 17, 18, 19 — bolts 20 — the head of the block of cylinders 21 — transferring 221, 222 — fingers of the sliding lever |
|
|
|
1. Pull out fingers (221), (222) sliding levers from the head of the block of cylinders. 2. Accept the sliding lever (15). 3. Prevent a bolt (16) strengthenings of a cover of a chain of an incentive of GRM to the head of the block of cylinders. |
| 4. Prevent bolts of strengthening of the head of the block of cylinders (17), (18 and (19) as it should be, down shown on an illustration. |
|
5. Accept the head of the block of cylinders (20) together with transferring (21). 6. Wipe opening under bolts of the head of the block of cylinders. |
|
Device
|
|
The device will be as it should be, carried out down removals. The order of a delay of bolts of strengthening of the head of cylinders is shown on an illustration. |
|
|