Mercedes S-Class W-140

In 1991-1999 editions

Repair and enterprise of the car



Mercedes S-Class
+ Mercedes Benz cars of the class S (W-140)
+ operation manual
+ Routine maintenance
- Motor
   Check of compression in the motor cylinder
   Check of the motor by means of vacuum meter
   Serpantinnogo belt of an incentive of auxiliary devices
   - 6-cylinder petrol engines (M104.944 and M104.990/994)
      Cover of the head of the block of cylinders - a device detail
      Removal and the device of the pipeline of access of the resonator (except the motor 104.990)
      Final collector (except the motor meter 104.990) - a device detail
      Removal and device of the head of the block of cylinders
      Removal and device of a cover of a chain of an incentive of GRM
      GRM incentive - the general information, service of components
      The starlet of a bent shaft - a device detail
      Removal and device of the regulator of a wave of curves
      Removal and device of waves of curves
      Compensation judging banks of gates
      Compensation of Sättel of gates
      Removal and device of pistons
      Compensation of piston rings
      Check of a condition of poles of an instinct
      Check of a condition of a bent shaft
      Service of the block of cylinders
      Removal and device of a peel kartera of the motor
      The fat pump - a device detail
      The touch switch of level of oil - a device detail, test data
   + 8-cylinder petrol engines (M119.970/981 and M119.971/981)
   + 12-cylinder petrol engines (M120.980/982)
   + 6-cylinder diesel engines (OM603.971)
   + 6-cylinder diesel engines (OM606.961)
+ cooling systems, heating
+ systems of power supply and edition
+ electric equipment of the motor
+ gear shifting boxes
+ Awtomatitscheckaja transmission
+ connection
+ brake system
+ Aufhängung and management
+ body
+ electric onboard equipment



Removal and device of a cover of a chain of an incentive of GRM

GRM incentive chain cover device details

16 — mother
93, 101, 213, 217 — carriers
94 — the air pump
96 — a chain cover
GRM incentive
96a — fingers

100 — WMT sensor
210 — fan mufty glass
273 — cooling system pump glass
284 — glass of the pump of the amplifier of management
326 — the generator

Removal

Bolts of strengthening of glasses of an incentive of auxiliary devices

210 — fan incentive mufty glass
273 — glass of an incentive of the water pump
284 — glass of an incentive of the tax pump


 EXECUTION ORDER

1. Exclude the negative line of the battery.
2. Accept the filter for purification of air.
3. Prevent the lower protective sign of the motor.
4. Be lowered by fan muftu.
5. Weaken bolts of strengthening of glasses.
6. Accept a generator incentive belt.
7. Prevent bolts of strengthening of glasses (shooter) and accept mufty glasses of the fan (210), cooling systems (273) and debts of the amplifier of management (284) are long.
8. Accept glass of a bent shaft of the motor.
9. Open a cooling system heater cover.
10. Designate position of starlets of waves of curves concerning GRM incentive chain.
11. Weaken and prevent bolts (3) and (4). Accept the carrier (213). Prevent a bolt (1) strengthening of the carrier (213) to the combined carrier. Grease germetikom 002 989 45 20 Forward and back opening (shooter) of the carrier (213).
12. Prevent the pump of transfer of air from the carrier.
13. Prevent bolts (214) and (214a) and accept the carrier of the fan (217). Prevent mother (99). Accept a sensor of WMT (100) together with the line and strengthen it along with it.
14. Exclude lines of the generator. Prevent bolts and accept the generator together with the carrier.
15. Prevent bolts of strengthening of a cover of a chain of an incentive of GRM to a peel.
16. Accept GRM incentive chain cover together with WMT sensor carrier
17. Wipe uplotnitelnyje of a surface of the block of cylinders and a cover of a chain of an incentive of GRM.

Device

 EXECUTION ORDER

The device will be as it should be, made down removals. The cover of a chain of an incentive of GRM is established on 2 fingers long 6 mm. Do not damage transferring of a peel., First Of All, you tighten bolts of strengthening of a cover of a chain of an incentive of GRM to a peel.