1. Prevent mother (92d) and accept a block disk (92e), accept a feather of glasses (70e) and a persistent ring (70d).
2. Pull out a tax wave (70 g), a persistent ring (70b) and a blocking ring (70c) .dwa the ring block on models with a contact spiral are defined. Wypressujte the ball-bearing from a pipe, a tax wave using, just you replace it.
Installation
EXECUTION ORDER
1. Sapressujte the ball-bearing (70a) in an external pipe (81b) before blow. Establish a tax wave (70 g). Sapressujte second ball-bearing (70a).
2. Establish a persistent ring (70b) and a blocking ring (70c) together on a tax wave (70 g), are convinced that the blocking ring (70c) is blocked in necessary situation in a fold of a tax wave.
3. Establish a persistent ring (70d), a feather of glasses (70e) and a new blocking disk (92e) to underground mining of uschkami in the direction after mother, turn mother (92d) and tighten them by hand.
4. Check ease of Drehens of a tax wave. The tax wave should not have an axial beating in a pipe and has to rotate without jamming.