Mercedes S-Class W-140

In 1991-1999 editions

Repair and enterprise of the car



Mercedes S-Class
+ Mercedes Benz cars of the class S (W-140)
+ operation manual
+ Routine maintenance
+ motor
+ cooling systems, heating
+ systems of power supply and edition
+ electric equipment of the motor
+ gear shifting boxes
+ Awtomatitscheckaja transmission
+ connection
+ Brake system
- Aufhängung and management
   Precautionary measures
   Corners of the device of wheels of the car, klirens
   + suspension bracket of a forward axis
   + Back Aufhängung
   - Management
      Removal and the device of the tax pump (model by means of motors 104, 119, 120 and 606)
      Discussion and installation of the pump of the amplifier of management
      Discussion and installation in an electronic way - the settled tax crevice
      Removal and device of the lower tax wave
      Removal and device of an incentive teleskopitscheskoj of regulation of a tax crevice
      Removal and device of a support of a pipe
      Discussion and installation of an internal pipe
      The device of the top carrier of strengthening of a pipe (model up to number of identification 123446)
      Device of the top carrier of strengthening of a pipe (model of number of identification 123447)
      Removal and device of the cylinder of the block (model till 31.08.95 wyp).
      Removal and device of the cylinder of the block (model of 1.09.95 wyp).
      Contact spring
      Removal and device of an average tax draft
      Removal and device of the lever of a pendulum of a tax incentive
      Removal and device of a cross tax draft
+ body
+ electric onboard equipment



Discussion and installation of an internal pipe

Discussion

 EXECUTION ORDER

1. Prevent mother (92d) and accept a block disk (92e), accept a feather of glasses (70e) and a persistent ring (70d).

2. Pull out a tax wave (70 g), a persistent ring (70b) and a blocking ring (70c) .dwa the ring block on models with a contact spiral are defined. Wypressujte the ball-bearing from a pipe, a tax wave using, just you replace it.

Installation

 EXECUTION ORDER

1. Sapressujte the ball-bearing (70a) in an external pipe (81b) before blow. Establish a tax wave (70 g). Sapressujte second ball-bearing (70a).
2. Establish a persistent ring (70b) and a blocking ring (70c) together on a tax wave (70 g), are convinced that the blocking ring (70c) is blocked in necessary situation in a fold of a tax wave.
3. Establish a persistent ring (70d), a feather of glasses (70e) and a new blocking disk (92e) to underground mining of uschkami in the direction after mother, turn mother (92d) and tighten them by hand.
4. Check ease of Drehens of a tax wave. The tax wave should not have an axial beating in a pipe and has to rotate without jamming.