Mercedes S-Class W-140

In 1991-1999 editions

Repair and enterprise of the car



Mercedes S-Class
+ Mercedes Benz cars of the class S (W-140)
+ operation manual
+ Routine maintenance
+ motor
+ cooling systems, heating
+ systems of power supply and edition
+ electric equipment of the motor
+ gear shifting boxes
+ Awtomatitscheckaja transmission
+ connection
+ Brake system
- Aufhängung and management
   Precautionary measures
   Corners of the device of wheels of the car, klirens
   + suspension bracket of a forward axis
   + Back Aufhängung
   - Management
      Removal and the device of the tax pump (model by means of motors 104, 119, 120 and 606)
      Discussion and installation of the pump of the amplifier of management
      Discussion and installation in an electronic way - the settled tax crevice
      Removal and device of the lower tax wave
      Removal and device of an incentive teleskopitscheskoj of regulation of a tax crevice
      Removal and device of a support of a pipe
      Discussion and installation of an internal pipe
      The device of the top carrier of strengthening of a pipe (model up to number of identification 123446)
      Device of the top carrier of strengthening of a pipe (model of number of identification 123447)
      Removal and device of the cylinder of the block (model till 31.08.95 wyp).
      Removal and device of the cylinder of the block (model of 1.09.95 wyp).
      Contact spring
      Removal and device of an average tax draft
      Removal and device of the lever of a pendulum of a tax incentive
      Removal and device of a cross tax draft
+ body
+ electric onboard equipment



Discussion and installation in an electronic way - the settled tax crevice

Design in an electronic way - the settled tax crevice

Discussion

 EXECUTION ORDER

1. Accept a tax crevice.
2. Accept network (71c) from the lower part of a tax wave.
3. Exclude the lower tax wave (80a).

Check

 EXECUTION ORDER

1. Check a cross beating of the lower tax wave (80a).
2. Accept the lower carrier (82).
3. Install height regulator in average situation.
4. Accept an incentive of regulation of an arrangement of a tax crevice (the top part / the lower part) (î20m2).
5. Be lowered by teleskopitscheski a regulation incentive (inside / later outside) (î20m1).
6. Accept a support of a tax crevice (83).
7. Accept the carrier (85).
8. Prevent a bolt (86) strengthenings of a cover and pull out an internal pipe from an external pipe down.
9. Order an internal pipe.

Installation

 EXECUTION ORDER

1. Collect an internal pipe.
2. Grease an internal pipe (81b) and establish them below in an external pipe.
3. Turn in directing a bolt (86), a fold on an internal pipe (81b) with a bolt it is combined.
4. Establish teleskopitscheski a regulation incentive (inside / later outside) (î20m1).
5. The installation as it should be which is carried out down removals will be farther. The maximum admissible beating of the lower tax wave forms 2.0 mm.