Mercedes S-Class + Mercedes Benz cars of the class S (W-140) + operation manual + Routine maintenance - Motor Check of compression in the motor cylinder Check of the motor by means of vacuum meter Serpantinnogo belt of an incentive of auxiliary devices + 6-cylinder petrol engines (M104.944 and M104.990/994) - 8-cylinder petrol engines (M119.970/981 and M119.971/981) Covers of the heads of the block of cylinders - a device detail Removal and device of the pipeline of access Removal and device of a final collector Removal and device of the heads of the block of cylinders Removal and kryschek device of a chain of an incentive of GRM Compensation of a chain of an incentive of GRM Check of phases of management of gas exchange GRM incentive - the general information, service of components Removal and device of the regulator of phases of management of gas exchange Removal and device of waves of curves Check and regulation of control provision of waves of curves Removal and device of gates Compensation judging banks of gates Compensation of rings of Sättel of gates Removal and device of pistons Name and volumes of pistons Check of a condition of poles of an instinct Check of a condition of a bent shaft + 12-cylinder petrol engines (M120.980/982) + 6-cylinder diesel engines (OM603.971) + 6-cylinder diesel engines (OM606.961) + cooling systems, heating + systems of power supply and edition + electric equipment of the motor + gear shifting boxes + Awtomatitscheckaja transmission + connection + brake system + Aufhängung and management + body + electric onboard equipment
|
Compensation of a chain of an incentive of GRM
Removal of a chain of an incentive of GRM
|
|
|
01 — kernels 04, 05 — wedges 2 — top the judging levers |
4 — GRM incentive chain 8 — a disk |
|
|
|
1. Bring the motor into situation 45 ° in front of the WMT piston of the first cylinder in situation. 2. Block from ядр (01) waves of curves of the right head of the block of cylinders. 3. Be lowered by natjaschitel of a chain of an incentive of GRM and natjaschnoj the lever (2) is valid above. 4. Block a chain on starlets of waves of curves by means of wedges (04 and (05). 5. Wypressujte of fingers of a chain (4) between starlets of access and final starlets. 6. By means of the screw-driver you take a disk (8) unchain (4). 7. Pull out the double member of a chain (4). 8. Connect a new chain (5) too as before (4) by means of the member (6) and междудиск (7) (thickness of 1.6 mm) and an external disk (8). 9. Pull out fingers (01). |
|
Compensation of a chain of an incentive of GRM
|
|
|
01 — kernels 04, 05 — wedges 4 — the Old chain 5 — the New chain |
6 — the connecting member 7 — Between karter 8 — the External disk 10 — a key |
|
|
|
1. Accept a wedge (05), a hand a chain in starlets of waves of curves in this stage it is burdensome. 2. Weaken the provision of a wedge (04) on the starlet of a final wave. 3. Turn a bent shaft by means of a key (10), a hand a chain in starlets of waves of curves it is burdensome. Are convinced that the chain at turn did not change the place. At the same time the new chain within a cover of GRM has to be defined. 4. You exclude the end of an old chain (4) from a new chain (5). 5. Turn a bent shaft until an opportunity does not connect the ends of a new chain by means of the connecting member. 6. Establish wedges (04 and (05) on starlets. 7. Connect a new chain (5) members (6) and a disk (7).
|
|
Installation of a chain of an incentive of GRM
|
|
|
1 — a skhvatyvaniye 2 — passing a persistent disk |
8 — the External disk 06 — a bolt |
|
|
|
1. Establish a skhvatyvaniye (1) Squeeze out and you establish a chain in it. Screw up a bolt (28). 2. Establish a passable persistent disk (2). 3. Establish an external disk (8) (thickness of 1.2 mm) in a passable persistent disk. 4. Will put the press on a lead. 5. Screw up a bolt (06) and sapressujte a chain. Are convinced that fingers of the connecting member of sapressowany in an external disk (8). 6. Accept the press. |
|
Installation of a chain of an incentive of GRM
|
|
|
1. Translate back persistent disk (shooter) (2). 2. Establish the press over the central finger. 3. Tighten a bolt (06) moments of 30 Nanometers. 4. Fingers of the connecting member (6) sapressowywajutsja separated. 5. Check sapressowku (arrows) and if it is necessary you you repeat them. 6. Establish waves of curves in control situation. 7. Establish chain natjaschitel. 8. Check the control provision of waves of curves. |
|
|
|