2 — a basic rack 3 — the hydro-compensator 5 — the Persistent detail 6 — nippers
7 — support 8, 23 — bolts 9 — Pressure of levers 14 — crackers 15 — the Top bolt of a feather
Establish the head of the block of cylinders (87) on the basis (24). Establish an insert (25) on the basis (24) in the direction of an arrow (26).
EXECUTION ORDER
1. Priwernite the head of the block of cylinders (87) to the basis (24) by means of bolts of strengthening of the head of the block of cylinders ahead and behind in the direction of an arrow (26). 2. Establish a basic rack (2) with support (7) in not the central situation. 3. Priwernite basic rack of 2 (2) bolts of M7x35 (bolts of strengthening of kryschek of camps). 4. Accept the hydro-compensator (3) from each cylinder. 5. You strengthen pressure the lever (9) with a persistent detail (5) on support. 6. Strengthen a persistent detail (5) vertically on a bolt of a feather (15). 7. Strengthen support (7) bolts (8). 8. Squeeze a feather (17). 9. Accept crackers of the gate (14). 10. Accept a feather of the gate (17) together with a bolt (15). 11. Replace network of the gate (19). 12. Accept the lower bolt of a feather (20). 13. Accept the head of the block of cylinders (87) from the basis and accept gates (21).
Device
The device will be as it should be, made down removals.