Mercedes S-Class W-140

In 1991-1999 editions

Repair and enterprise of the car



Mercedes S-Class
+ Mercedes Benz cars of the class S (W-140)
+ operation manual
+ Routine maintenance
+ motor
+ cooling systems, heating
+ systems of power supply and edition
+ electric equipment of the motor
+ gear shifting boxes
+ Awtomatitscheckaja transmission
+ connection
+ Brake system
- Aufhängung and management
   Precautionary measures
   Corners of the device of wheels of the car, klirens
   + suspension bracket of a forward axis
   - Back Aufhängung
      stupitschnaja installation - a device detail
      Removal and device of a feather of screws
      The stabilizer of cross immunity - a device detail
      Removal and device of the muffler
      Removal and the device of a back depreciation rack (model with hydraulic regulation of Aufhängung)
      Check of the hydraulic pump
      Removal and the device of the accumulator of pressure of a hydraulic actuator of back Aufhängung (model with a code 217a "back the self-settled Aufhängung with ADS" and a code 480 "management of klirensom of back Aufhängung")
      Removal and device of the klirensom control unit of back Aufhängung
      dempfernyje gates - a device detail
      Removal and device of the gate of regulation klirensa
      Klirensa regulator of back Aufhängung
   + management
+ body
+ electric onboard equipment



Removal and device of the gate of regulation klirensa

Details of the device of the gate of regulation of klirensa of a kuzova

50 — the distribution gate
52 — the switch
54 — a connecting draft
Y36 — the Gate of regulation klirensa of a kuzova

Removal

 EXECUTION ORDER

1. Accept this forward wheel would argue.
2. Prevent the 3rd bolts (shooter) and accept a board (a) on the right leaf of a wheel.
3. Exclude the aggravating pipeline () from the steel listener. Pull together liquid.
4. Exclude a connecting draft (54) from the lever on the regulator (6).
5. Be lowered - the gate (Y36), a collar of strengthening of the gate accepted, exclude plugs of the line (Y36) and (Y37) gates.
6. On models which are delivered to the USA: exclude a connecting draft (15) from the lever on the regulator (6).
7. Prevent strengthening bolts (52c), lift the gate of distribution (50) from the switch (52) and carefully you accept it.
8. Prevent bolts (50e), exclude the gate (Y36) of the switch (50).

Device

The device will be as it should be, carried out down removals.

Always you replace ring uplotnitelnyje.

In front of the device, you wipe uplotnitelnyje of a surface and all details. Check correctness of the uplotnitelnych device of rings.